Supremus Group
BIA, RA, BCP, DRP template BIA, BCP, DRP plan Disaster Recovery Plan (DRP) template Business Continuity Program (BCP) template Data Center Recovery template Risk Assessment Template Business Impact Analysis (BIA) template

Preventive Measures Examples


The following list contains examples of preventative measures that can be implemented by the company to mitigate the potential risks that currently exist.   Some of these activities may be achievable easily, as to where some may take more time and more resources.

Natural Risks

These risks are usually associated with weather related events:  flooding, high winds, severe storms, tornado, hurricane, fire, high winds, snow storms, and ice storms. 

Risk / Threat

Preventative Measures

Earthquakes

  • Move large and heavy objects to the fall to prevent injury (from falling on people.)
  • Equipment tie-downs are used on all critical computer equipment.
  • Emergency power is available on-site.
  • Earthquake construction guidelines have been adhered to so that damage can be minimized.
  • Critical data and vital records should be backed up and sent offsite for storage.
  • Staff should be trained in Earthquake evacuations and safety.

Man-Made Risks

These risks are usually associated with man-made type of events:  Bomb threats, vandalism, terrorism, civil disorder, sabotage, hazardous waste, work stoppage (internal/external), and computer crime. 

Risk / Threat

Preventative Measures

Staff Productivity Risks
  • Alternate sources of trained employees have been identified
  • Proper training and necessary cross-training is conducted
  • Files are backed up and procedures are documented
  • The work areas are comfortable and safe

Environmental Risks

These risks are usually associated with exposures from surrounding facilities, businesses, government agencies, etc. 

Risk / Threat

Preventative Measures

Hazardous Materials Plant

 

  • There is a nightly backup of data processing electronic record and that backup is stored off-site
  • The off-site backup facility is a sufficient distance away from this facility
  • An alternate site has been identified for use in the event that this facility is unusable

To view specific section of this document, please contact us at sales@supremusgroup.com or call us at (515) 865-4591.

To buy individual template packages, visit following links:
 
Request Sample Client Testimonials Contact Us
Home | About Us | Contact Us | Reseller | Press Release | Privacy Notice | Refund Policy | Site Map
Business Impact Analysis and Assessment (BIA) templates | Risk Assessment | Data Center Technology Disaster Recovery Plan | Business Continuity Plan (BCP) templates | Disaster Recovery Plan (DRP) templates | Hospital Disaster Recovery Plan
Tel: (515) 865-4591 | Fax: (515) 221-2363
Copyright © 2006-08 www.SupremusGroup.com A SUPREMUS GROUP venture

Website Design and SEO by Iowa Web Design Company
This site is best viewed using Internet Explorer 5.0/higher or Netscape Navigator 7.0/higher at 1024x768 resolution for optimum performance