Sample from template

The following required and/or recommended information inputs should be completed using the full electronic version of the Disaster Recovery Plan Template and the Technology Components Recovery Plan Templates.  These templates can be obtained from the <Enter Business Resumption Planning Department Name>.  Those sections marked with a “Required” are sections that are required to be completed.  Sections with a “Recommended” are recommended and “Optional” are optional. 

A.  General Information

Confidentiality Statement (Required)

All your documents should remain confidential to your company.  You will need to put a confidentially statement in this section.  If you company has a confidentiality statement that is used for all document, use that here. 

Plan Maintenance (Required)

Document all revisions, deletions, additions, etc. that have been made to this document.

  1. Record the Version of the Document that is located at the Top Right hand side on the cover page.
  2. Record the description of the change (i.e.: updated contact information.)
  3. Identify what Chapter, Section and Page that was updated.
  4. Document the name of the person who made the change.
  5. Record the date the change was made.

This log should be kept with the document at all times.  Never delete revision history.  Just keep expanding the table.

Plan Exercise (Required)

Document any exercises (tests) that have been conducted using this plan.  This will help the auditing of the plans by providing information about the testing activities that have taken place. 

  1. Record the date of the tests.
  2. Identify the type of exercise that was conducted.  (Call Tree, Walkthrough, Table Top, etc.)
  3. Record the results of the exercise.  (It was successful, etc.)

Table of Contents for Disaster Recovery Planning Standard

TERMINOLOGY     
ACCOUNTABILITY
COMPLIANCE        

I.  DISASTER RECOVERY PLANNING STANDARDS

A.  General Information           
B.  Executive Summary
C.  Scope & Objectives          
D.  Recovery Strategy 
E.  Plan Assumptions & Exposures      
F.  Disaster Declaration Procedures     
E.  Recovery Teams    
F.  Contact Lists          
G.  Alternate Locations
H.  Plan Certification    

II. APPLICATION RECOVERY PLAN STANDARDS

A.  General Information           
B.  Plan Introduction    
C.  Application Profile 
D.  Plan Activation Procedures
E.  Team Members & Responsibilities  
F.  Recovery Procedures         
G.  Contact Lists         
H.  Alternate Locations
I.  Restoration of Normal Operations   

III. SERVER RECOVERY PLAN STANDARDS 

A.  General Information           
B.  Plan Introduction    
C.  Server Profile         
D.  Plan Activation Procedures
E.  Team Members & Responsibilities  
F.  Recovery Procedures         
G.  Contact Lists         
H.  Alternate Locations
I.  Restoration of Normal Operations   

IV. NETWORK RECOVERY PLAN STANDARDS  

A.  General Information           
B.  Plan Introduction    
C.  Network Profile     
D.  Plan Activation Procedures
E.  Team Members & Responsibilities  
F.  Recovery Procedures         
G.  Contact Lists         
H.  Alternate Locations
I.  Restoration of Normal Operations   

V. TELECOMMUNICATIONS RECOVERY PLAN STANDARDS 

A.  General Information           
B.  Plan Introduction    
C.  Telecommunication Profile  
D.  Plan Activation Procedures
E.  Team Members & Responsibilities  
F.  Recovery Procedures         
G.  Contact Lists         
H.  Alternate Locations
I.  Restoration of Normal Operations   

VI. DATABASE RECOVERY PLAN STANDARDS  

A.  General Information           
B.  Plan Introduction    
C.  Database Profile    
D.  Plan Activation Procedures
E.  Team Members & Responsibilities  
F.  Recovery Procedures         
G.  Contact Lists         
H.  Alternate Locations
I.  Restoration of Normal Operations   

To view specific section of this document, please contact us at sales@supremusgroup.com or call us at (515) 865-4591.

To buy individual template packages, visit following links:

Request Sample Client Testimonials Contact Us
Home | About Us | Contact Us | Reseller | Press Release | Privacy Notice | Refund Policy | Site Map
Business Impact Analysis and Assessment (BIA) templates | Risk Assessment | Data Center Technology Disaster Recovery Plan | Business Continuity Plan (BCP) templates | Disaster Recovery Plan (DRP) templates | Hospital Disaster Recovery Plan
Tel: (515) 865-4591 | Fax: (515) 221-2363
Copyright © 2006-08 www.SupremusGroup.com A SUPREMUS GROUP venture

Website Design and SEO by Iowa Web Design Company
This site is best viewed using Internet Explorer 5.0/higher or Netscape Navigator 7.0/higher at 1024x768 resolution for optimum performance