Supremus Group
BIA, RA, BCP, DRP template BIA, BCP, DRP plan Disaster Recovery Plan (DRP) template Business Continuity Program (BCP) template Data Center Recovery template Risk Assessment Template Business Impact Analysis (BIA) template

Server Recovery Plan for Business Resumption Planning

 


Purpose

This Server Disaster Recovery Plan for Business Resumption Planning documents the strategies, personnel, procedures and resources necessary to recover the <Enter Server Name> Server following any type of long or short term disruption.  The following objectives have been established for this plan:

  • Maximize the value of business resumption planning by establishing recovery plans that consists of the following phases:
    1. Notification / Activation:  To activate the plan and notify vendors, customers, employees, etc of the recovery activities
    2. Recovery Phase:  To recovery and resume temporary IT operations on alternate hardware (equipment) and possibly at an alternate location
    3. Restoration Phase:  To restore IT systems processing capabilities to normal operations at the primary location or the new location
  • Define the activities, procedures, and essential resources required to perform <Enter Server Name> processing requirements during prolonged periods of disruption to normal operations.
  • Allocate responsibilities to designated personnel and provide guidance for recovering <Enter Server Name> during prolong periods of interruption to normal operations. 
  • Make certain coordination with other <Enter Company Name> staff is conducted. 
  • Ensure coordination with external contacts, like vendors, suppliers, etc. who will participate in the recovery process. 

Table of Contents for Server Recovery Plan

CONFIDENTIALITY STATEMENT

PLAN MAINTENANCE 

PLAN EXERCISE            

PLAN LOCATION          

PLAN DISTRIBUTION   

PLAN INTRODUCTION

Purpose                 
Applicability          
Scope                   
Assumptions          
Use of this Plan      

SERVER PROFILE 

Server Specifications   
Network Requirements
Applications          

PLAN ACTIVATION PROCEDURES       
            Plan Activation Team   

TEAM MEMBERS & RESPONSIBILITIES       

Activate Team Members          
Travel to Alternate Location     

RECOVERY PROCEDURES 

            Restore Server Services

RESTORATION PROCEDURES

Original or New Site Restoration          
Concurrent Processing 
Plan Deactivation   

APPENDIX  

Appendix A:  Employee Contact List   
Appendix B:  Vendor Contact List

To view specific section of this document, please contact us at sales@supremusgroup.com or call us at (515) 865-4591.

To buy individual template packages, visit following links:
 
Request Sample Client Testimonials Contact Us
Home | About Us | Contact Us | Reseller | Press Release | Privacy Notice | Refund Policy | Site Map
Business Impact Analysis and Assessment (BIA) templates | Risk Assessment | Data Center Technology Disaster Recovery Plan | Business Continuity Plan (BCP) templates | Disaster Recovery Plan (DRP) templates | Hospital Disaster Recovery Plan
Tel: (515) 865-4591 | Fax: (515) 221-2363
Copyright © 2006-08 www.SupremusGroup.com A SUPREMUS GROUP venture

Website Design and SEO by Iowa Web Design Company
This site is best viewed using Internet Explorer 5.0/higher or Netscape Navigator 7.0/higher at 1024x768 resolution for optimum performance